Red brick two-story house with a brick chimney, shuttered windows and a small porch

Burbank Chimney Rebuilds Planned Around the Flue Inside

We rebuild it with the liner planned from the start, sized for the fireplace or appliance it will serve.

Describe the Problem

Camera Scan of the Flue
Stills With Every Report
Written Quote Before Work
Liners Sized to the Appliance
Based in Burbank
Camera Scan of the Flue
Stills With Every Report
Written Quote Before Work
Liners Sized to the Appliance
Based in Burbank

What We Check and Do

A rebuild is the moment to get the flue right. When a stack has cracked through, leans, or lost its top in a quake, we take it down to sound masonry and rebuild with steel reinforcement and a liner sized to the appliance it will serve. Rebuilding only above the roofline is common when the lower stack scans clean on camera. Every rebuild is quoted in writing after an inspection.

Brick removed down to sound courses
Rebar set in the new stack
Fresh liner placed as courses rise
Top-only rebuild when the base scans clean
Permit filing included

When a Rebuild Beats Another Repair

Some chimneys are past repair, and the signs show from the yard and on the camera at the same time. Outside: a stack that leans away from the house, cracks that run through bricks rather than along joints, courses that have shifted sideways, or a top section that rocks when pushed. Inside: a band of broken flue tiles at the roofline, joints opened on one side, tiles pushed out of line. When both views agree, the masonry and the liner have moved together, usually in an earthquake, and patching one without the other does not hold. In Burbank and the rest of the San Fernando Valley, many of the chimneys we rebuild still carry damage from the 1994 Northridge quake, often patched on the outside at the time and never filmed inside. We write a rebuild proposal only after the camera has run, so the decision rests on what the flue shows as well as what the brick shows. If a repair would hold, the proposal says so and puts the repair beside the rebuild, so you can weigh the two with the footage in front of you.

A rebuild can start at different heights. The most common is from the roofline up: the stack above the roof is taken down course by course, the brick that remains is checked for soundness, and a new stack is built on top. When damage runs below the roof, the rebuild goes lower, sometimes to the firebox. Some owners choose a lighter build above the roof, such as a framed chase with a metal flue, which cuts the weight that would move in the next quake; others want brick to match the house. Each choice has a different cost and a different look, and the proposal sets them out in general terms so you can compare. The flue inside the new stack is planned from the start: clay tile set as the stack rises, or a stainless liner sized for the fireplace, insert or gas appliance it will serve. Rebuilds in most cities here need a permit, and the proposal says which steps need one and where the city inspection falls in the job.

Sizing the New Flue Before the First Course Goes Up

A rebuild is the one chance to get the flue right without compromise. In an old stack, the flue size is whatever the builder chose, and it may be too large or too small for the fireplace below it. A flue that is too large lets gas cool and creosote form; one that is too small spills smoke into the room. When we rebuild, we size the flue to the fireplace opening, or to the insert or appliance you plan to use, before any brick is laid. If you are thinking about a gas insert in the next few years, tell us now: an insert needs its own liner, and it is simpler to plan the flue for it than to reline a brand new stack later. The same goes for a wood stove. The camera footage from the old flue goes into the proposal so you can see why the size is changing, and the finished liner gets its own camera pass once the stack is up.

Rebuilds take planning, so the written scope goes into detail: how far down the stack comes, how debris leaves the roof, how the roof and flashing are protected and replaced at the base, what the crown and cap will be, and what liner goes inside. Brick matching is part of it. Older Pasadena and Glendale houses often have brick that is no longer made, and we note whether we can match it closely, reuse sound bricks from the old stack or suggest a different finish such as stucco over the new work. For postwar houses in Canoga Park and Burbank, matching tends to be easier. Rebuild prices are always written after an inspection, because height, access, roof type and how far down the damage runs move the number more than anything else. The proposal shows the repair option next to the rebuild wherever a repair is possible, so the choice stays yours and rests on what the camera recorded.

  • Scan First
  • Stills Marked
  • Posted Prices
  • Sized to the Appliance

Flue and liner guides, with prices where we have them

Call (747) 224-8947